
| 2018 | |
|---|---|
| Criterium: | Position: |
| Overall Score: | > 1000 |
| Total Project Funding per Partner: | > 1000 |
| Total Number of Projects: | > 1000 |
| Networking Rank (Reputation): | > 1000 |
| 2011 | |
| Criterium: | Position: |
| Overall Score: | > 1000 |
| Networking Rank (Reputation): | > 1000 |
| 2010 | |
| Criterium: | Position: |
| Overall Score: | > 1000 |
| Networking Rank (Reputation): | > 1000 |
Total number of projects: 6
As coordinator: 2
As participant: 4
Sole participant: 0
Coordinator / Participant Ratio: 0.5*
| Total project funding [€]: | Projects [No]: | |||||
|---|---|---|---|---|---|---|
| Year: | coordinator* | participant* | per partner | as coordinator | as participant | |
| 2018 | 0 | 6.497.513 | 369.444 | 1 | ||
| 2017 | 999.177 | 3.495.216 | 668.969 | 1 | 1 | |
| 2013 | 0 | 23.612.079 | 299.160 | 1 | ||
| 2011 | 0 | 5.800.000 | 307.000 | 1 | ||
| 2010 | 4.925.707 | 0 | 697.745 | 1 | ||
Total number of partners: 102
Partner loyalty:
Frequent Partner: (> 2 projects): 0
Rare Partner: 102
Frequent / Rare Partner Ratio: 0
| Start date | Project | acronym | role | funding | partners |
|---|---|---|---|---|---|
| 2018-09-01 | ThermoformAble, repaIrable and bondable smaRt ePOXY based composites for aero structures | AIRPOXY | participant | 6.497.513 | 11 |
| 2017-10-01 | Designing the railway of the future: Fire resistant composite materials and smart modular design | Mat4Rail | participant | 3.495.216 | 16 |
| 2017-02-01 | Hybrid Fixed Leading Edge | HFLE | coordinator | 999.177 | 4 |
| 2013-06-01 | """2nd Generation Active Wing“ – Active Flow- Loads & Noise control on next generation wing" | AFLONEXT | participant | 23.612.079 | 40 |
| 2011-12-01 | One-shot Manufacturing on large scale of 3D up graded panels and stiffeners for lightweight thermoplastic textile composite structures | MAPICC 3D | participant | 5.800.000 | 21 |
| 2010-10-01 | Innovative Material Synergies & Composite Processing Strategies | IMS&CPS | coordinator | 4.925.707 | 16 |