Institution statistics

ANSALDO INDUSTRIA - Italy 

Ranking results:

Past rankings:
2019
Criterium:Position:
Overall Score:> 1000
Total Project Funding per Partner:> 1000
Total Number of Projects:> 1000
Ranking timeline:

European project participation (2010-01-01 - 2021-12-31 ):

Performance:

Funding:

Total funding allocated to projects this organisation participated or coordinated

Funding per Partner:

Since 2014 individual funding per partner. If data is not available at CORDIS: total funding / No of participants.

Projects:
Leadership:

Total number of projects: 45
As coordinator: 4
As participant: 41
Sole participant: 0
Coordinator / Participant Ratio: 0.1*

*Ratio includes only projects with > 2 partners

Summary:
Total project funding [€]:Projects [No]:
Year:coordinator*participant*per partner  as coordinatoras participant
2020 0 17.011.061 0 2
2019 0 6.269.905 510.000 2
2017 0 24.303.099 0 4
2016 0 14.478.215 0 3
2015 4.252.447 27.790.520 0 1 2
2013 0 44.876.929 0 7
2012 0 25.058.364 1.224.632 7
2011 0 57.584.648 0 10
2010 18.735.762 11.684.243 52.976 3 4
*n.b.: These numbers represent the total amount of funds allocated to projects this institution has participated in, not the funding allocated to this institution

Networking:

Constancy:

Total number of partners:26

Partner loyalty:
Frequent Partner: (> 2 projects): 0
Rare Partner: 26

Frequent / Rare Partner Ratio: 0

Diversity:

Subjects:
Subject:No:
Diversity index:0
Categories:
Category:No:

Project overview:

Start dateProjectacronymrolefundingpartners
2020-09-01PRE-DISposal management of radioactive waste PREDISparticipant14.000.00047
2020-09-01INNOvative tools FOR dismantling of GRAPHite moderated nuclear reactors INNO4GRAPHparticipant3.011.06113
2019-06-01Passive Isolation Condenser PIACEparticipant2.247.23011
2019-02-01POLlution Know-how and Abatement POLKAparticipant4.022.67517
2017-10-01Annular Instabilities and Transient Phenomena in Gas Turbine Combustors ANNULIGhTparticipant3.974.48310
2017-10-01TURBOmachinery REtrofits enabling FLEXible back-up capacity for the transition of the European energy system TURBO-REFLEXparticipant7.212.09526
2017-10-01TURBOmachinery REtrofits enabling FLEXible back-up capacity for the transition of the European energy system TURBO-REFLEXparticipant7.212.09526
2017-09-01Performance Untapped Modulation for Power and Heat via Energy Accumulation Technologies PUMP-HEATparticipant5.904.42615
2016-01-01Flexible Fossil Power Plants for the Future Energy Market through new and advanced Turbine Technologies FLEXTURBINEparticipant6.477.59625
2016-01-01Flexible Fossil Power Plants for the Future Energy Market through new and advanced Turbine Technologies FLEXTURBINEparticipant6.477.59625
2016-01-01RHINOS - Railway High Integrity Navigation Overlay System will define a GNSS-based system to support the localization of trains respecting the challenging requirements of the railway safety standards. RHINOSparticipant1.523.0247
2015-05-01Cyber Physical System based Proactive Collaborative Maintenance MANTISparticipant9.791.97447
2015-05-01Innovative Intelligent Rail IN2RAILparticipant17.998.54654
2015-02-01ERTMS on SATELLITE – Enabling Application Validation ERSAT EAVcoordinator4.252.44712
2013-12-01solving CHAllenges in Nuclear DAta CHANDAparticipant5.400.00035
2013-11-01Assessment of Regional CApabilities for new reactors Development through an Integrated Approach ARCADIAparticipant1.499.43527
2013-10-01Increasing Capacity 4 Rail networks through enhanced infrastructure and optimised operations CAPACITY4RAILparticipant9.890.10547
2013-09-01Next Generation Train Control NGTCparticipant6.361.03321
2013-09-01Preparing ESNII for HORIZON 2020 ESNII PLUSparticipant6.455.00036
2013-05-01Future Of Surface Transport Research Rail FOSTER RAILparticipant1.659.43920
2013-05-01Critical System Engineering Acceleration CRYSTALparticipant13.611.91668
2012-11-01"INTEROPERABLE MONITORING, DIAGNOSIS AND MAINTENANCE STRATEGIES FOR AXLE BEARINGS" MAXBEparticipant3.000.00018
2012-11-01Thermo-acoustic and aero-acoustic nonlinearities in green combustors with orifice structures TANGOparticipant3.736.3089
2012-11-01"Methodology, Analysis and eXperiments for the ""Safety In MYRRHA Assessment""" MAXSIMAparticipant5.500.00014
2012-10-01Sustainable and intelligent management of energy for smarter railway systems in Europe: an integrated optimisation approach MERLINparticipant4.499.32518
2012-01-01Proposal for a harmonized European methodology for the safety assessment of innovative reactors with fast neutron spectrum planned to be built in Europe SARGEN_IVparticipant999.12822
2012-01-01Scintillation Detectors And New Technologies For Nuclear Security SCINTILLAparticipant3.023.65210
2012-01-01Optimal Strategy to Innovate and Reduce energy consumption In urban rail Systems OSIRISparticipant4.299.95117
2011-12-01OPtimization of a Thermal energy Storage system with integrated Steam Generator OPTSparticipant8.649.50011
2011-11-01Combined Model-based Analysis and Testing of Embedded Systems MBATparticipant5.386.06741
2011-11-01Optimal Networks for Train Integration Management across Europe ON-TIMEparticipant5.381.96919
2011-10-01EXploiting safety results aCROSS transportation modes EXCROSSparticipant932.7826
2011-10-01Evaluation of critical and emerging technologies for the elaboration of a security research agenda ETCETERAparticipant1.512.74214
2011-10-01Reduction of Suicides and Trespasses on RAILway property RESTRAILparticipant2.816.24318
2011-10-01Seismic-Initiated events risk mitigation in LEad-cooled Reactors SILERparticipant2.926.13318
2011-09-01New embedded Systems arcHItecturE for multi-Layer Dependable solutions nSHIELDparticipant1.711.14824
2011-04-01Secured Urban Transportation - European Demonstration SECUR-EDparticipant25.468.07243
2011-03-01Fast Reactor Experiments for hYbrid Applications FREYAparticipant2.799.99217
2010-09-01The Railway-Industry Partnership for Integrated Security of Rail Transport PROTECTRAILcoordinator13.115.06431
2010-06-01pilot embedded Systems arcHItecturE for multi-Layer Dependable solutions PS.HI.E.L.D.participant900.59917
2010-04-02Lead-cooled European Advanced Demonstration Reactor LEADERcoordinator2.994.08817
2010-03-01European Gas Cooled Fast Reactor GoFastRparticipant3.000.00022
2010-02-01Thermal-hydraulics of Innovative Nuclear Systems THINSparticipant5.941.81124
2010-01-01MCFC catalyst and stack component degradation and lifetime: Fuel Gas CONTaminant effects and EXtraction strategies MCFC-CONTEXparticipant1.841.83311
2010-01-01A railway automatic track warning system based on distributed personal mobile terminals ALARPcoordinator2.626.6107

Alias institution names:
  • ANSALDO ENERGIA
  • ANSALDO ENERGIA SWITZERLAND
  • ANSALDO FUEL CELLS
  • ANSALDO INDUSTRIA
  • ANSALDO STS

Data provision: © European Union; Source: CORDIS, http://cordis.europa.eu/ | This page is not provided by the European Commission see:Impressum